[{"data":1,"prerenderedAt":183},["ShallowReactive",2],{"menus-en-ie":3,"content-en-ie-news\u002F2022\u002Fdart-coastal-north-public-consultation-begins":131,"sidebar-en-ie-news\u002F2022":157,"breadcrumbs-en-ie-news\u002F2022\u002Fdart-coastal-north-public-consultation-begins":182},{"mainMenu":4,"footerMenu":96},[5,13,82,89],{"__typename":6,"_system_":7,"slug":9,"label":10,"subpages":11},"Navigation",{"id":8},"96b47639-528b-59ae-9848-46941e3edef8","about-dart","About DART+ Programme",{"items":12},[],{"__typename":6,"_system_":14,"slug":16,"label":17,"subpages":18},{"id":15},"2fb01086-4219-5dcf-af85-9d5194fd2c01","projects","Projects",{"items":19},[20,32,42,52,62,72],{"__typename":6,"_system_":21,"label":23,"slug":24,"link":25},{"id":22},"2dc307f6-8625-5782-86c5-dbd919775eaf","DART+ West","dart-west",{"externalUrl":26,"linkedItem":27,"label":23,"newWindow":30},"",{"__typename":28,"slug":29},"Page","projects\u002Fdart-west",{"items":31},[],{"__typename":6,"_system_":33,"label":35,"slug":36,"link":37},{"id":34},"610e99ac-1635-573d-9d0e-8965a85bcd5c","DART+ South West","dart-south-west",{"externalUrl":26,"linkedItem":38,"label":35,"newWindow":40},{"__typename":28,"slug":39},"projects\u002Fdart-south-west",{"items":41},[],{"__typename":6,"_system_":43,"label":45,"slug":46,"link":47},{"id":44},"c487e302-d504-5717-9bf3-9da9d5800f6d","DART+ Coastal North","dart-coastal-north",{"externalUrl":26,"linkedItem":48,"label":45,"newWindow":50},{"__typename":28,"slug":49},"projects\u002Fdart-north",{"items":51},[],{"__typename":6,"_system_":53,"label":55,"slug":56,"link":57},{"id":54},"040d121a-6ec9-5b79-af88-ccb58c778ec1","DART+ Coastal South","dart-coastal-south",{"externalUrl":26,"linkedItem":58,"label":55,"newWindow":60},{"__typename":28,"slug":59},"projects\u002Fdart-coastal-south",{"items":61},[],{"__typename":6,"_system_":63,"label":65,"slug":66,"link":67},{"id":64},"89db318a-cb74-5191-95da-4dd4b39246a6","DART+ Fleet","dart-fleet",{"externalUrl":26,"linkedItem":68,"label":65,"newWindow":70},{"__typename":28,"slug":69},"projects\u002Fdart-fleet",{"items":71},[],{"__typename":6,"_system_":73,"label":75,"slug":76,"link":77},{"id":74},"bb6ebc70-bafc-4531-8659-364560b967ee","DART+ Depot","dart-depot",{"externalUrl":26,"linkedItem":78,"label":75,"newWindow":80},{"__typename":28,"slug":79},"projects\u002Fdart-depot\u002Fpublic-consultation-1",{"items":81},[],{"__typename":6,"_system_":83,"slug":85,"label":86,"subpages":87},{"id":84},"aa5e6b7c-1089-55dc-89bb-6975b60a4370","news","News",{"items":88},[],{"__typename":6,"_system_":90,"slug":92,"label":93,"subpages":94},{"id":91},"141b0d1c-fab1-51f9-97da-bfbd824f3da3","faqs","FAQs",{"items":95},[],[97,108,120],{"__typename":6,"_system_":98,"slug":100,"label":101,"link":102,"subpages":106},{"id":99},"97f864fb-0841-5063-9eae-181190f04045","contact-us","Contact Us",{"externalUrl":26,"linkedItem":103,"label":101,"newWindow":104},{"__typename":28,"slug":100},{"items":105},[],{"items":107},[],{"__typename":6,"_system_":109,"slug":111,"label":112,"link":113,"subpages":118},{"id":110},"ec744e0a-3631-5b05-ae79-3ac80102ad8c","terms-privacy-cookies","Terms of Use, Privacy Statement and Cookie Policy",{"externalUrl":26,"linkedItem":114,"label":112,"newWindow":116},{"__typename":28,"slug":115},"cookies",{"items":117},[],{"items":119},[],{"__typename":6,"_system_":121,"slug":123,"label":124,"link":125,"subpages":129},{"id":122},"00aa43f1-8c51-53ea-957d-d4132b9509a6","accessibility","Accessibility",{"externalUrl":26,"linkedItem":126,"label":124,"newWindow":127},null,{"items":128},[],{"items":130},[],{"_document":132,"_seoSnippet":153,"_system_":154,"slug":156},{"title":133,"description":134,"date":135,"body":136},"DART+ Coastal North Public Consultation begins","The first round of public consultation on the DART+ Coastal North Emerging Preferred Option is now open until Friday 8th April 2022. Iarnród Éireann is hosting a series of public webinars to present the emerging preferred option and give communities along the route the opportunity to pose questions to the project team.","2022-02-23T18:30:00Z",{"html":137,"components":138,"linkedItems":151},"\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n7ec2f583_9ea9_01a0_f56b_ec9ddc9d2f59\">\u003C\u002Fobject>",{"items":139},[140],{"__typename":141,"_system_":142,"content":145},"ContentBlock",{"id":143,"codename":144},"7ec2f583-9ea9-01a0-f56b-ec9ddc9d2f59","n7ec2f583_9ea9_01a0_f56b_ec9ddc9d2f59",{"html":146,"components":147,"linkedItems":149},"\u003Cp>DART+ Coastal North will deliver an increased and improved electrified network, with additional passenger capacity and enhanced train services between Drogheda and Howth and Dublin City Centre.  &nbsp;\u003C\u002Fp>\n\u003Cp>A dedicated interactive&nbsp;\u003Ca href=\"https:\u002F\u002Fwww.dartplusvr.ie\u002F\">virtual room is available\u003C\u002Fa>&nbsp;which contains full details of the emerging preferred option for this route. &nbsp;\u003C\u002Fp>\n\u003Cp>Your feedback on the&nbsp;Emerging&nbsp;Preferred&nbsp;Option is important to help shape the developing design of DART+ Coastal North.&nbsp;Iarnród&nbsp;Éireann&nbsp;is hosting a series of public webinars to present the emerging preferred option and give communities along the route the opportunity to pose questions to the project team. Please see details of the webinars below.  &nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Residents from&nbsp;Dublin&nbsp;City Centre&nbsp;to&nbsp;Donaghmede&nbsp;area&nbsp;8th&nbsp;March&nbsp;2022 at 19:00hrs&nbsp;\u003C\u002Fli>\n  \u003Cli>Residents from the&nbsp;Bayside&nbsp;to Howth&nbsp;area&nbsp;9th&nbsp;March&nbsp;2022 at 19:00hrs&nbsp;\u003C\u002Fli>\n  \u003Cli>Residents from the&nbsp;Clongriffin&nbsp;to Malahide&nbsp;area&nbsp;10th&nbsp;March&nbsp;2022 at 19:00hrs&nbsp;\u003C\u002Fli>\n  \u003Cli>Residents from the&nbsp;Donabate&nbsp;to Balbriggan&nbsp;area&nbsp;14th&nbsp;March&nbsp;2022 at 19:00hrs&nbsp;\u003C\u002Fli>\n  \u003Cli>Residents from the&nbsp;Gormanston&nbsp;to Drogheda&nbsp;area&nbsp;15th&nbsp;March&nbsp;2022 at 19:00hrs&nbsp;&nbsp;&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>To register to attend one or more of these webinars email&nbsp;\u003Ca data-email-address=\"DARTCoastalNorth@irishrail.ie\" href=\"mailto:DARTCoastalNorth@irishrail.ie\">DARTCoastalNorth@irishrail.ie\u003C\u002Fa>&nbsp;and state which webinar(s) you would like to attend. You will then be issued with a link to join. &nbsp;\u003C\u002Fp>\n\u003Cp>A clear understanding of the project status and design will help you in preparing your submission on the project. View the ways in which you can send in your submission on the&nbsp;\u003Ca href=\"\u002Fen-ie\u002Fprojects\u002Fdart-north\u002Fpublic-consultation-round-1\u002Fhow-to-engage-contact-us\">How to Engage&nbsp;\u003C\u002Fa>page on&nbsp;\u003Ca href=\"\u002F\" data-new-window=\"true\" target=\"_blank\" rel=\"noopener noreferrer\">www.dartplus.ie\u003C\u002Fa>. &nbsp;\u003C\u002Fp>",{"items":148},[],{"items":150},[],{"items":152},[],{"metaTitle":26,"metaDescription":26,"searchIndexPriority":126,"urlAlias":26},{"id":155},"711b9b12-c447-57e4-8018-73feafce2ea1","news\u002F2022\u002Fdart-coastal-north-public-consultation-begins",{"title":158,"subpages":159},"2022",[160,164,167,169,172,175,178,179],{"slug":161,"title":162,"type":163},"news\u002F2022\u002Fan-bord-pleanala-statutory-consultation-for-the-da","An Bord Pleanála Statutory Consultation for the DART+ West Railway Order application is now closed","article",{"slug":165,"title":166,"type":163},"news\u002F2022\u002Fdart-west-railway-order-application-1","DART+ West Railway Order Application",{"slug":168,"title":166,"type":163},"news\u002F2022\u002Fdart-west-railway-order-application",{"slug":170,"title":171,"type":163},"news\u002F2022\u002Fpublic-consultation-round-1-on-the-emerging-prefer","Public consultation round 1 on the emerging preferred option for DART+ Coastal North now closed",{"slug":173,"title":174,"type":163},"news\u002F2022\u002Flocal-ashtown-public-consultation-on-the-revised-p","Local Ashtown Public Consultation on the revised preferred option for the DART+ West is now closed.",{"slug":176,"title":177,"type":163},"news\u002F2022\u002Frevised-ashtown-preferred-option","Revised Ashtown Preferred Option",{"slug":156,"title":133,"type":163},{"slug":180,"title":181,"type":163},"news\u002F2022\u002Fdart-coastal-north-public-consultation-begins-1","DART+ Coastal North Public Consultation",{"news":86,"news\u002F2022":158,"news\u002F2022\u002Fdart-coastal-north-public-consultation-begins":133},1788856259339]