Skip to main content

Accessible version of the Emerging Preferred Option for Memorial Road Bridge.

This is a graphic showing the Emerging Preferred Option for the Memorial Road Bridge. The Emerging Preferred Option replaces the bridge with a longer span bridge. In addition, the rail tracks will be lowered to facilitate the electrification infrastructure beneath the new bridge.

Top