[{"data":1,"prerenderedAt":193},["ShallowReactive",2],{"menus-en-ie":3,"content-en-ie-railwayorder/dartwest":105,"sidebar-en-ie-railwayorder":100},{"mainMenu":4,"footerMenu":76},[5,11,66,71],{"__typename":6,"slug":7,"label":8,"subpages":9},"Navigation","about-dart","About DART+ Programme",{"items":10},[],{"__typename":6,"slug":12,"label":13,"subpages":14},"projects","Projects",{"items":15},[16,26,34,42,50,58],{"__typename":6,"label":17,"slug":18,"link":19},"DART+ West","dart-west",{"externalUrl":20,"linkedItem":21,"label":17,"newWindow":24},"",{"__typename":22,"slug":23},"Page","projects/dart-west",{"items":25},[],{"__typename":6,"label":27,"slug":28,"link":29},"DART+ South West","dart-south-west",{"externalUrl":20,"linkedItem":30,"label":27,"newWindow":32},{"__typename":22,"slug":31},"projects/dart-south-west",{"items":33},[],{"__typename":6,"label":35,"slug":36,"link":37},"DART+ Coastal North","dart-coastal-north",{"externalUrl":20,"linkedItem":38,"label":35,"newWindow":40},{"__typename":22,"slug":39},"projects/dart-north",{"items":41},[],{"__typename":6,"label":43,"slug":44,"link":45},"DART+ Coastal South","dart-coastal-south",{"externalUrl":20,"linkedItem":46,"label":43,"newWindow":48},{"__typename":22,"slug":47},"projects/dart-coastal-south",{"items":49},[],{"__typename":6,"label":51,"slug":52,"link":53},"DART+ Fleet","dart-fleet",{"externalUrl":20,"linkedItem":54,"label":51,"newWindow":56},{"__typename":22,"slug":55},"projects/dart-fleet",{"items":57},[],{"__typename":6,"label":59,"slug":60,"link":61},"DART+ Depot","dart-depot",{"externalUrl":20,"linkedItem":62,"label":59,"newWindow":64},{"__typename":22,"slug":63},"projects/dart-depot/public-consultation-1",{"items":65},[],{"__typename":6,"slug":67,"label":68,"subpages":69},"news","News",{"items":70},[],{"__typename":6,"slug":72,"label":73,"subpages":74},"faqs","FAQs",{"items":75},[],[77,86,96],{"__typename":6,"slug":78,"label":79,"link":80,"subpages":84},"contact-us","Contact Us",{"externalUrl":20,"linkedItem":81,"label":79,"newWindow":82},{"__typename":22,"slug":78},{"items":83},[],{"items":85},[],{"__typename":6,"slug":87,"label":88,"link":89,"subpages":94},"terms-privacy-cookies","Terms of Use, Privacy Statement and Cookie Policy",{"externalUrl":20,"linkedItem":90,"label":88,"newWindow":92},{"__typename":22,"slug":91},"cookies",{"items":93},[],{"items":95},[],{"__typename":6,"slug":97,"label":98,"link":99,"subpages":103},"accessibility","Accessibility",{"externalUrl":20,"linkedItem":100,"label":98,"newWindow":101},null,{"items":102},[],{"items":104},[],{"_document":106,"slug":182,"showSideMenu":183,"showBreadcrums":188},{"body":107,"title":181,"description":20},{"html":108,"components":109,"linkedItems":179},"\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n95e02cd8_d32a_016d_8e54_0637d7ec1b50\">\u003C/object>\n\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n82609ab0_8696_0145_b828_a488057b1068\">\u003C/object>\n\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n4e77a910_a6aa_01f6_4126_038aca7983cd\">\u003C/object>",{"items":110},[111,117,174],{"__typename":112,"_system_":113,"content":115},"ContentBlock",{"codename":114},"n95e02cd8_d32a_016d_8e54_0637d7ec1b50",{"html":116},"\u003Ch2>Introduction\u003C/h2>\n\u003Cp>Córas Iompair Éireann (CIÉ) has applied to An Bord Pleanála for approval of a Railway Order for the DART+ West project. Subject to approval, the Railway Order will authorise CIÉ to carry out railway works and all works necessary to enable the construction, operation, maintenance and improvement of railway. The project involves the electrification of approximately 40 km of permanent way (railway line) from Dublin City centre to west of Maynooth and to M3 Parkway Station and all associated supporting infrastructure.\u003C/p>\n\u003Cp>A copy of the newspaper notices in the Irish Independent and relevant local/regional newspapers circulating along the DART+ West route is provided below:\u003C/p>\n\u003Cp>\u003Ca data-asset-id=\"dfd3f17e-65a3-5e5d-a99b-bfa8aa88bbae\" href=\"https://assets-eu-01.kc-usercontent.com:443/a439a0e7-eaa3-0154-d646-f6520be9179b/8ed7c54f-e827-4b8d-b04f-1c3d8284ca2c/75a63614-032a-4bd6-9452-1e671d479f71.pdf\">Newspaper Notice 12th September 2022\u003C/a>\u003C/p>\n\u003Cp>\u003Ca data-asset-id=\"b43156b0-4d59-5c48-94da-9bef3e59dc3c\" href=\"https://assets-eu-01.kc-usercontent.com:443/a439a0e7-eaa3-0154-d646-f6520be9179b/03f69e92-30bb-49c7-8c14-5f7282b2e9a1/42645752-8e4b-4c8a-bc1b-207e2d80ccfc.pdf\">Newspaper Notice 25th July 2022\u003C/a>\u003C/p>\n\u003Cp>\u003Ca data-asset-id=\"378bdc1b-90c3-5153-bb15-cd16c45b74ad\" href=\"https://assets-eu-01.kc-usercontent.com:443/a439a0e7-eaa3-0154-d646-f6520be9179b/0d35a8e0-6dec-468e-8bfe-d1347662361d/d3af3c50-bcbd-4f0c-85a5-09a5e644826d.pdf\">Newspaper Notice 09th November 2023\u003C/a>\u003C/p>",{"__typename":118,"_system_":119,"title":122,"subtitle":20,"cta":100,"listType":123,"items":128},"List",{"id":120,"codename":121},"82609ab0-8696-0145-b828-a488057b1068","n82609ab0_8696_0145_b828_a488057b1068","DART+ West - Railway Order",{"items":124},[125],{"_system_":126},{"codename":127},"resources",{"items":129},[130,134,138,142,146,150,154,158,162,166,170],{"__typename":118,"_system_":131,"title":133,"subtitle":20,"cta":100},{"codename":132},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_2","1 Railway Order",{"__typename":118,"_system_":135,"title":137,"subtitle":20,"cta":100},{"codename":136},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_6","2 Railway Order Book of Reference",{"__typename":118,"_system_":139,"title":141,"subtitle":20,"cta":100},{"codename":140},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_84","3 Railway Order Drawings",{"__typename":118,"_system_":143,"title":145,"subtitle":20,"cta":100},{"codename":144},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_287","4 EIAR",{"__typename":118,"_system_":147,"title":149,"subtitle":20,"cta":100},{"codename":148},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_301","5 Appropriate Assessment",{"__typename":118,"_system_":151,"title":153,"subtitle":20,"cta":100},{"codename":152},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_303","6 Planning Report",{"__typename":118,"_system_":155,"title":157,"subtitle":20,"cta":100},{"codename":156},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_305","7 Site Specific Flood Risk Assessment",{"__typename":118,"_system_":159,"title":161,"subtitle":20,"cta":100},{"codename":160},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_308","8 Submission on Observations to the Draft Railway Order Application",{"__typename":118,"_system_":163,"title":165,"subtitle":20,"cta":100},{"codename":164},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_310","9 Update to the Natura Impact Statement",{"__typename":118,"_system_":167,"title":169,"subtitle":20,"cta":100},{"codename":168},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_312","10 Submission on Observations to the Update to the Natura Impact Statement",{"__typename":118,"_system_":171,"title":173,"subtitle":20,"cta":100},{"codename":172},"n_243139a2_9bda_4185_b6b6_c0050b70640c_res_list_318","11 Alternative Footbridge Options Presented During Oral Hearing",{"__typename":112,"_system_":175,"content":177},{"codename":176},"n4e77a910_a6aa_01f6_4126_038aca7983cd",{"html":178},"\u003Cp>The download links for the Railway Order application have been tested. If you get an error message please try to refresh the link. If problem persists, please contact us on \u003Ca data-email-address=\"dartwest@irishrail.ie\" href=\"mailto:dartwest@irishrail.ie\">dartwest@irishrail.ie\u003C/a>\u003C/p>",{"items":180},[],"DART+ West Railway Order Application","railwayorder/dartwest",{"items":184},[185],{"_system_":186},{"codename":187},"no",{"items":189},[190],{"_system_":191},{"codename":192},"yes",1775206011740]