[{"data":1,"prerenderedAt":155},["ShallowReactive",2],{"menus-ga-ie":3,"content-ga-ie-projects/dart-coastal-south/public-consultation-1/key-infrastructural-elements":104,"sidebar-ga-ie-projects/dart-coastal-south/public-consultation-1":129,"breadcrumbs-ga-ie-projects/dart-coastal-south/public-consultation-1/key-infrastructural-elements":154},{"mainMenu":4,"footerMenu":77},[5,11,67,72],{"__typename":6,"slug":7,"label":8,"subpages":9},"Navigation","about-dart","Eolas Faoin DART+",{"items":10},[],{"__typename":6,"slug":12,"label":13,"subpages":14},"projects","Tionscadail",{"items":15},[16,26,34,42,50,58],{"__typename":6,"label":17,"slug":18,"link":19},"DART+ an Iarthair","dart-west",{"externalUrl":20,"linkedItem":21,"label":17,"newWindow":24},"",{"__typename":22,"slug":23},"Page","projects/dart-west",{"items":25},[],{"__typename":6,"label":27,"slug":28,"link":29},"DART+ An tIardheisceart","dart-south-west",{"externalUrl":20,"linkedItem":30,"label":27,"newWindow":32},{"__typename":22,"slug":31},"projects/dart-south-west",{"items":33},[],{"__typename":6,"label":35,"slug":36,"link":37},"DART+ Cósta Thuaidh","dart-coastal-north",{"externalUrl":20,"linkedItem":38,"label":35,"newWindow":40},{"__typename":22,"slug":39},"projects/dart-north",{"items":41},[],{"__typename":6,"label":43,"slug":44,"link":45},"DART+ Cósta Theas","dart-coastal-south",{"externalUrl":20,"linkedItem":46,"label":43,"newWindow":48},{"__typename":22,"slug":47},"projects/dart-coastal-south",{"items":49},[],{"__typename":6,"label":51,"slug":52,"link":53},"Flít DART+","dart-fleet",{"externalUrl":20,"linkedItem":54,"label":51,"newWindow":56},{"__typename":22,"slug":55},"projects/dart-fleet",{"items":57},[],{"__typename":6,"label":59,"slug":60,"link":61},"DART+ Depot","dart-depot",{"externalUrl":62,"linkedItem":63,"label":59,"newWindow":65},"/ga-ie/projects/dart-depot",{"__typename":22,"slug":64},"projects/dart-depot",{"items":66},[],{"__typename":6,"slug":68,"label":69,"subpages":70},"news","Nuacht",{"items":71},[],{"__typename":6,"slug":73,"label":74,"subpages":75},"faqs","Ceisteanna Coitianta",{"items":76},[],[78,87,96],{"__typename":6,"slug":79,"label":80,"link":81,"subpages":85},"contact-us","Déan teagmháil linn",{"externalUrl":20,"linkedItem":82,"label":80,"newWindow":83},{"__typename":22,"slug":79},{"items":84},[],{"items":86},[],{"__typename":6,"slug":88,"label":89,"link":90,"subpages":94},"terms-privacy-cookies","Téarmaí Úsáide, Ráiteas Príobháideachais agus Beartas maidir le Fianáin",{"externalUrl":20,"linkedItem":91,"label":89,"newWindow":92},null,{"items":93},[],{"items":95},[],{"__typename":6,"slug":97,"label":98,"link":99,"subpages":102},"accessibility","Inrochtaineacht",{"externalUrl":20,"linkedItem":91,"label":98,"newWindow":100},{"items":101},[],{"items":103},[],{"_document":105,"slug":119,"showSideMenu":120,"showBreadcrums":125},{"body":106,"title":118,"description":20},{"html":107,"components":108,"linkedItems":116},"\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n8f455207_c199_0115_7494_3d7e965b0bda\">\u003C/object>",{"items":109},[110],{"__typename":111,"_system_":112,"content":114},"ContentBlock",{"codename":113},"n8f455207_c199_0115_7494_3d7e965b0bda",{"html":115},"\u003Cp>The following is a high-level summary of the key infrastructural elements included as part of DART+ Coastal South, Stage 1: Bray to Greystones Capacity Enhancements.\u003C/p>\n\u003Ch3>Stage 1: Bray to Greystones Capacity Enhancements\u003C/h3>\n\u003Cul>\n  \u003Cli>Infrastructure modifications to facilitate the proposed increase in service, from two to three trains per hour, between Bray (Daly) and Greystones Stations\u003C/li>\n  \u003Cli>Construction of an additional crossover (track modifications to allow a train to cross from one section of track to another) just south of Bray (Daly) Station and associated modifications to reduce the length of Platform 1 at Bray (Daly) Station to 180m. These works essentially extend the length of double track within the station and allow trains to cross from one track to the other\u003C/li>\n  \u003Cli>Proposed upgrade of Level crossing XR012 (Ennis Lane Level Crossing) at Rathdown Road to a CCTV controlled crossing to improve safety for users. Existing access across the railway will be maintained\u003C/li>\n  \u003Cli>Undertaking upgrades to existing signalling, telecoms and power supplies to support the planned increase in train services\u003C/li>\n  \u003Cli>Ancillary civils, drainage and power works as necessary to accommodate the project\u003C/li>\n\u003C/ul>\n\u003Cp>Proposed interventions required as part of Stage 2 works will be developed in future, separately to the Stage 1 (Bray to Greystones Capacity Enhancements) works, and will seek to address the existing constraints on capacity on the Southern Line between Dublin City Centre and Bray.\u003Cbr>\u003Cbr>\u003Cbr>\u003C/p>",{"items":117},[],"Príomhghnéithe Bonneagracha","projects/dart-coastal-south/public-consultation-1/key-infrastructural-elements",{"items":121},[122],{"_system_":123},{"codename":124},"yes",{"items":126},[127],{"_system_":128},{"codename":124},{"title":130,"subpages":131},"Comhairliúcháin Phoiblí 1",[132,134,137,140,143,146,149,151],{"slug":119,"title":118,"type":133},"page",{"slug":135,"title":136,"type":133},"projects/dart-coastal-south/public-consultation-1/route-map","Léarscáil de Bhealach DART+ Cósta Theas",{"slug":138,"title":139,"type":133},"projects/dart-coastal-south/public-consultation-1/benefits-of-dart-coastal-south","Buntáistí Líne DART+ Cósta Theas",{"slug":141,"title":142,"type":133},"projects/dart-coastal-south/public-consultation-1/emerging-preferred-option","An Rogha is Fearr",{"slug":144,"title":145,"type":133},"projects/dart-coastal-south/public-consultation-1/next-steps","Na Chéad Chéimeanna Eile",{"slug":147,"title":148,"type":133},"projects/dart-north-south/information/useful-resources-and-downloads","Acmhainní agus Earraí Áisiúla le hÍoslódáil",{"slug":150,"title":74,"type":133},"projects/dart-coastal-south/public-consultation-1/frequently-asked-questions",{"slug":152,"title":153,"type":133},"projects/dart-coastal-south/public-consultation-1/how-to-engage-contact-us","Conas Dul i nGníomh / i dTeagmháil Linn",{"projects/dart-coastal-south":43,"projects":13,"projects/dart-coastal-south/public-consultation-1/key-infrastructural-elements":118,"projects/dart-coastal-south/public-consultation-1":130},1778238046974]