Skip to main content

Accessible version of the Preferred Option for South Circular Road Junction.

This is an aerial overview of the Preferred Option for South Circular Road Junction. The Preferred Option leaves the South Circular Road Bridge in place and includes the construction of a new structure to the north of the existing bridge.

Top