[{"data":1,"prerenderedAt":180},["ShallowReactive",2],{"menus-ga-ie":3,"content-ga-ie-railwayorder/dart-south-west-railway-order":104,"sidebar-ga-ie-railwayorder":91},{"mainMenu":4,"footerMenu":77},[5,11,67,72],{"__typename":6,"slug":7,"label":8,"subpages":9},"Navigation","about-dart","Eolas Faoin DART+",{"items":10},[],{"__typename":6,"slug":12,"label":13,"subpages":14},"projects","Tionscadail",{"items":15},[16,26,34,42,50,58],{"__typename":6,"label":17,"slug":18,"link":19},"DART+ an Iarthair","dart-west",{"externalUrl":20,"linkedItem":21,"label":17,"newWindow":24},"",{"__typename":22,"slug":23},"Page","projects/dart-west",{"items":25},[],{"__typename":6,"label":27,"slug":28,"link":29},"DART+ An tIardheisceart","dart-south-west",{"externalUrl":20,"linkedItem":30,"label":27,"newWindow":32},{"__typename":22,"slug":31},"projects/dart-south-west",{"items":33},[],{"__typename":6,"label":35,"slug":36,"link":37},"DART+ Cósta Thuaidh","dart-coastal-north",{"externalUrl":20,"linkedItem":38,"label":35,"newWindow":40},{"__typename":22,"slug":39},"projects/dart-north",{"items":41},[],{"__typename":6,"label":43,"slug":44,"link":45},"DART+ Cósta Theas","dart-coastal-south",{"externalUrl":20,"linkedItem":46,"label":43,"newWindow":48},{"__typename":22,"slug":47},"projects/dart-coastal-south",{"items":49},[],{"__typename":6,"label":51,"slug":52,"link":53},"Flít DART+","dart-fleet",{"externalUrl":20,"linkedItem":54,"label":51,"newWindow":56},{"__typename":22,"slug":55},"projects/dart-fleet",{"items":57},[],{"__typename":6,"label":59,"slug":60,"link":61},"DART+ Depot","dart-depot",{"externalUrl":62,"linkedItem":63,"label":59,"newWindow":65},"/ga-ie/projects/dart-depot",{"__typename":22,"slug":64},"projects/dart-depot",{"items":66},[],{"__typename":6,"slug":68,"label":69,"subpages":70},"news","Nuacht",{"items":71},[],{"__typename":6,"slug":73,"label":74,"subpages":75},"faqs","Ceisteanna Coitianta",{"items":76},[],[78,87,96],{"__typename":6,"slug":79,"label":80,"link":81,"subpages":85},"contact-us","Déan teagmháil linn",{"externalUrl":20,"linkedItem":82,"label":80,"newWindow":83},{"__typename":22,"slug":79},{"items":84},[],{"items":86},[],{"__typename":6,"slug":88,"label":89,"link":90,"subpages":94},"terms-privacy-cookies","Téarmaí Úsáide, Ráiteas Príobháideachais agus Beartas maidir le Fianáin",{"externalUrl":20,"linkedItem":91,"label":89,"newWindow":92},null,{"items":93},[],{"items":95},[],{"__typename":6,"slug":97,"label":98,"link":99,"subpages":102},"accessibility","Inrochtaineacht",{"externalUrl":20,"linkedItem":91,"label":98,"newWindow":100},{"items":101},[],{"items":103},[],{"_document":105,"slug":169,"showSideMenu":170,"showBreadcrums":175},{"body":106,"title":168,"description":20},{"html":107,"components":108,"linkedItems":166},"\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n536a39da_5fa9_015a_2924_c44c88141ffa\">\u003C/object>\n\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n735fa183_36c0_01ee_9dbc_67b0c098df1d\">\u003C/object>\n\u003Cobject type=\"application/kenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n48ad40ea_316f_01f5_f872_e8e5fef79f36\">\u003C/object>",{"items":109},[110,116,161],{"__typename":111,"_system_":112,"content":114},"ContentBlock",{"codename":113},"n536a39da_5fa9_015a_2924_c44c88141ffa",{"html":115},"\u003Ch2>Introduction\u003C/h2>\n\u003Cp>Córas Iompair Éireann (CIÉ) received approval from An Bord Pleanála for a Railway Order for the DART+ South West project on 13 November 2024. The Railway Order application was submitted to An Bord Pleanála on 22 March 2023. The approved Railway Order authorises CIÉ to carry out railway works and all works necessary to enable the construction, operation, maintenance, and improvement of the railway between Hazelhatch and Celbridge Station (County Kildare) and Heuston Station, Dublin (approximately 16 km) on the Cork Main Line, as well as works between Heuston Station and Glasnevin via the Phoenix Park Tunnel Branch Line\u003C/p>\n\u003Cp>\u003Ca data-asset-id=\"ff427443-d3e3-5193-a1d9-1f1119b62c3b\" href=\"https://assets-eu-01.kc-usercontent.com:443/a439a0e7-eaa3-0154-d646-f6520be9179b/cb99c023-8066-4953-a5fc-4e5b2d7954dd/a42c49c0-c214-4ac8-8c61-e257ac09f4b1.jpg\">Newspaper Notice 13/03/2023 - English\u003C/a>\u003C/p>\n\u003Cp>\u003Ca data-asset-id=\"76de1920-c709-51ca-88df-578bcc5db1c8\" href=\"https://assets-eu-01.kc-usercontent.com:443/a439a0e7-eaa3-0154-d646-f6520be9179b/41a48217-089f-448a-b2ea-259e6ce8c775/6d0e37ee-e802-4797-b81e-fe66d1371ff3.jpg\">Newspaper Notice 13/03/2023 - Gaeilge\u003C/a>.\u003C/p>\n\u003Cp>\u003Ca href=\"/en-ie/railwayorder/information-on-the-railway-order-application-process\">Information on the Railway Order application process\u003C/a>\u003C/p>\n\u003Cp>\u003Cbr>\u003C/p>",{"__typename":117,"_system_":118,"title":121,"subtitle":20,"cta":91,"listType":122,"items":127},"List",{"id":119,"codename":120},"735fa183-36c0-01ee-9dbc-67b0c098df1d","n735fa183_36c0_01ee_9dbc_67b0c098df1d","DART+ South West Railway Order",{"items":123},[124],{"_system_":125},{"codename":126},"resources",{"items":128},[129,133,137,141,145,149,153,157],{"__typename":117,"_system_":130,"title":132,"subtitle":20,"cta":91},{"codename":131},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_3","1 Railway Order",{"__typename":117,"_system_":134,"title":136,"subtitle":20,"cta":91},{"codename":135},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_10","2 Railway Order Book of Reference",{"__typename":117,"_system_":138,"title":140,"subtitle":20,"cta":91},{"codename":139},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_69","3 Railway Order Drawings",{"__typename":117,"_system_":142,"title":144,"subtitle":20,"cta":91},{"codename":143},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_211","4 EIAR",{"__typename":117,"_system_":146,"title":148,"subtitle":20,"cta":91},{"codename":147},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_222","5 Appropriate Assessment",{"__typename":117,"_system_":150,"title":152,"subtitle":20,"cta":91},{"codename":151},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_224","6 Planning Report",{"__typename":117,"_system_":154,"title":156,"subtitle":20,"cta":91},{"codename":155},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_226","7 Site Specific Flood Risk Assessment Report",{"__typename":117,"_system_":158,"title":160,"subtitle":20,"cta":91},{"codename":159},"adba0d79_e7cb_4775_9d33_cfdeb7faca0c_res_list_229","8 Submission on Observations to the Draft Railway Order Application",{"__typename":111,"_system_":162,"content":164},{"codename":163},"n48ad40ea_316f_01f5_f872_e8e5fef79f36",{"html":165},"\u003Cp>The download links for the Railway Order application have been tested. If you get an error message, please try to refresh the link. If the problem persists, please contact us at \u003Ca data-email-address=\"DARTSouthWest@irishrail.ie\" href=\"mailto:DARTSouthWest@irishrail.ie\">DARTSouthWest@irishrail.ie\u003C/a>&nbsp;\u003C/p>",{"items":167},[],"DART+ South West Railway Order Application","railwayorder/dart-south-west-railway-order",{"items":171},[172],{"_system_":173},{"codename":174},"no",{"items":176},[177],{"_system_":178},{"codename":179},"yes",1775206014367]