DART+ South West Railway Order Application
Introduction
Córas Iompair Éireann (CIÉ) received approval from An Bord Pleanála for a Railway Order for the DART+ South West project on 13 November 2024. The Railway Order application was submitted to An Bord Pleanála on 22 March 2023. The approved Railway Order authorises CIÉ to carry out railway works and all works necessary to enable the construction, operation, maintenance, and improvement of the railway between Hazelhatch and Celbridge Station (County Kildare) and Heuston Station, Dublin (approximately 16 km) on the Cork Main Line, as well as works between Heuston Station and Glasnevin via the Phoenix Park Tunnel Branch Line
Newspaper Notice 13/03/2023 - English
Newspaper Notice 13/03/2023 - Gaeilge.
Information on the Railway Order application process
DART+ South West Railway Order
Zone D River Liffey Bridge to Glasnevin Junction
Zone D River Liffey Bridge to Glasnevin Junction
Zone D - River Liffey Bridge to Glasnevin Junction
Zone D - River Liffey Bridge to Glasnevin Junction
Chapter 02 Policy context and need for the project
Chapter 02 Policy context and need for the project
Chapter 10 Water including Hydrology and Flood Risk
Chapter 10 Water including Hydrology and Flood Risk
Chapter 16 Material Assets Agricultural Properties
Chapter 16 Material Assets Agricultural Properties
Chapter 17 Material Assets Non Agricultural Properties
Chapter 17 Material Assets Non Agricultural Properties
Chapter 19 Material Assets Resources and Waste Management
Chapter 19 Material Assets Resources and Waste Management
Chapter 20 Archaeological and Cultural Heritage
Chapter 20 Archaeological and Cultural Heritage
Chapter 22 Electromagnetic Compatibility and Stray Current
Chapter 22 Electromagnetic Compatibility and Stray Current
Chapter 27 Summary of Mitigation and Monitoring Measures
Chapter 27 Summary of Mitigation and Monitoring Measures
Zone D River Liffey Bridge to Glasnevin Junction
Zone D River Liffey Bridge to Glasnevin Junction
Designated Sites for Nature Conservation within the Study Area
Designated Sites for Nature Conservation within the Study Area
Designated Archaeological Monuments within 250m (Sheet 1 to 10)
Designated Archaeological Monuments within 250m (Sheet 1 to 10)
Structures of Architectural Heritage Significance (Sheet 1 to 10)
Structures of Architectural Heritage Significance (Sheet 1 to 10)
A5.1 Construction Environmental Management Plan
A5.1 Construction Environmental Management Plan
A18.1 Details of Utility Conflicts and Diversions
A18.1 Details of Utility Conflicts and Diversions
A19.1 Facilities Operating Under EPA Waste Licence in the EMR Waste Region
A19.1 Facilities Operating Under EPA Waste Licence in the EMR Waste Region
A26.1 Stage 1 and Stage 2 Cumulative Effects Assessment
A26.1 Stage 1 and Stage 2 Cumulative Effects Assessment
Appendix C Construction Environmental Management Plan
Appendix C Construction Environmental Management Plan
Appendix F Projects considered for In-Combination Assessment
Appendix F Projects considered for In-Combination Assessment