Skip to main content

News

Public consultation round 2 on the preferred option for the DART+ West is now closed.

Iarnród Éireann have now concluded the 2nd round of a non-statutory public consultation on the preferred option for DART+ West project.

Project Dart+ West Date: 11.10.2021

Update on DART+ West Preferred Option at Coolmine

Project Dart+ West Date: 25.05.2021

Update on DART+ West Preferred Option at Coolmine

We are now preparing for a second round of public consultation for the DART+ West project, which is due to launch in July 2021. In advance of the launch of these consultation, Iarnród Éireann is announcing that the Preferred Option for DART+ West at Coolmine is significantly different to that previously proposed. As an alternative to the provision of a new vehicular bridge, the DART+ West Preferred Option proposes to upgrade road junctions and re-route traffic on the existing road network by using the existing railway crossing points at Diswellstown Viaduct and Castleknock Bridge. Click here for more details.

Project Dart+ West Date: 25.05.2021

DART+ South West Public Consultation begins

Project Dart+ South West Date: 12.05.2021

DART+ South West Public Consultation begins

DART+ South West: public consultation begins to extend DART from Heuston to Hazelhatch incl Phoenix Park tunnel. Rail customer capacity to quadruple under transformative project.

Project Dart+ South West Date: 12.05.2021

Arup is appointed to assist in design of DART+ Coastal

Project Dart+ North South Date: 09.02.2021

Arup is appointed to assist in design of DART+ Coastal

Arup have been appointed as multi-disciplinary design consultants for the DART+ Coastal projects.

Project Dart+ North South Date: 09.02.2021
Top