Skip to main content

Accessible version of the Preferred Option for Sarsfield Road Underbridge.

This is a graphic showing the Preferred Option for the Sarsfield Road Bridge. The Preferred Option replaces the existing bridge deck with two parallel bridge decks, one for the Intercity service and one for the DART service. The existing walls along Sarsfield Road will be mostly left untouched by the construction works.

Top