Skip to main content

Accessible version of the Preferred Option for South Circular Road Bridge.

This is a graphic showing the Preferred Option for the South Circular Road Bridge. The Preferred Option leaves the South Circular Road Bridge in place and includes the construction of a new structure to the north of the existing bridge. The new structure would be for the new DART tracks and the existing Intercity service would continue under the existing South Circular Road Bridge.

Top